Group
03_3523303084e92cf8aeebd8.jpg
05_4228292724e92cf6af0614.jpg
06_6734429884e92cf66597bb.jpg
07_793707304e92cecbb1b81.jpg
08_16943406704e92cf442d206.jpg
10a_9602400964e92cf173df3c.jpg
02_15151359735061d254d5d19.jpg
04_9468281295061d26619cd9.jpg
09_1681682805061d273f0f08.jpg
11_9562095055061d2828331e.jpg
12_5584573815061d2912b793.jpg
13_7330317825061d2a19c667.jpg
14_3196677945061d2d883cdb.jpg
News
14/12/2012
Martifer delivers on Sunday the first stadium for the Brazil World Cup

Martifer Construções Metálicas Ltda concluded the construction of the roof of the Castelão Stadium, one of the twelve stadiums of the 2014 World Cup which will take place in Brazil, an infrastructure that will be inaugurated on December 16th by the President of Brazil, Dilma Rousseff.
 
 
04/12/2012
Martifer Solar completes two photovoltaic plants in Greece

Martifer Solar has completed the construction of two photovoltaic projects in Greece, a 277 KW ground based photovoltaic plant in Kalamos and a 400 KW rooftop installation in Keratea, in the Attica region.
 
 
25/10/2012
Martifer Solar signs contract for first project in Ukraine with 4.5MW capacity

Martifer Solar has signed an EPC contract for construction of a 4.5 MW photovoltaic project in Ukraine with Green Agro Service LLC, a company of Rengy Development group.
 
 
28/09/2012
Martifer Metallic Constructions develops the engineering of the metallic construction of Birmingham New Street station
 
 
25/09/2012
Martifer Solar completes two photovoltaic plants in Portugal with a total capacity of 22.4 MWp

Martifer Solar has today inaugurated two solar photovoltaic plants in the Algarve region of Portugal, with a total capacity of 22.4 MWp, developed, built and operated for a fund managed by BNP Paribas Clean Energy Partners.
 
 
13/09/2012
Martifer Solar signs agreement to build a 20 MW photovoltaic project in Mexico

Martifer Solar has signed an agreement with Consorcio Integrador Sonora80M to build a 20 MW photovoltaic project in Hermosillo, in the state of Sonora, in northern Mexico. The company, which has been in the Mexican market since 2011, will also be in charge of operation and maintenance services.
 
 
05/09/2012
Martifer Solar concluded its first photovoltaic plant in Romania

Martifer Solar, an affiliate of Martifer SGPS SA, acting as EPC Contractor, concluded the construction of a 1.5 MW photovoltaic plant in Pufesti, in the Vrancea County, Romania for Eurowind Energy A/S, a Danish company.
 
 
08/08/2012
Martifer Solar finishes 9 small generation PV installations for the Ferpinta Group

Martifer Solar built 9 photovoltaic installations for the Ferpinta Group, totalling 714 kWp of installed capacity.
 
 
27/07/2012
London Cable Car – Martifer at the Olympic Games in London

The new London Cable Car had Martifer’s participation in the execution of structural steelwork, façades, cladding and balustrades.
This cable car is a part of the infrastructures built for the Olympic Games in London, which starts today, and demanded a few particular features in its construction.
 
 
29/06/2012
Portuguese Minister of the Economy visits Navalria to watch the construction of the new DouroAzul hotel boats

The Portuguese Minister of the Economy, Álvaro Santos Pereira, has visited today Navalria's shipyard, a part of the Martifer Group, to check the evolution of the construction of the two hotel boats, comissioned by DouroAzul, a leading company in the river cruises in Douro.
 
 
15/06/2012
Martifer Metallic Constructions with two relevant projects in Saudi Arabia

Martifer Metallic Constructions is currently developing two major projects in Saudi Arabia: the King Abdullah Financial District and the King Abdullah Sports City’s stadium.
 
 
15/05/2012
Martifer Solar signs a deal with General Motors Brazil for the construction of a project in Joinville

Martifer Solar has signed an EPC (Engineering, Procurement and Construction) contract with General Motors Brasil for the construction of a 300 kW photovoltaic installation in a plant of the North American group in Joinville, in the state of Santa Catarina, located in Southern Brazil.
 
 
01/03/2012
Martifer presents 2011 results with significant improvements in the fourth quarter

Martifer Group's Revenues reached 550.1 M€ in 2011, a 7% drop comparing with 2010, affected by the reduction in the metallic construction area's activity.
 
 
27/02/2012
Martifer Solar completes the construction of a ground-mounted project in France

Martifer Solar has successfully delivered a new ground-mounted photovoltaic installation in France. Located in Les Mées, the plant‘s peak power reaches 2,07 MW and covers an area of 4 hectares.
 
 
19/01/2012
Martifer Solar reaches 200 MW implemented worldwide

Martifer Solar achieved, by the end of 2011, 200 MW of clean energy implemented worldwide, consolidating its leading position as EPC in the solar sector.