ENGINEERING

With a highly qualified team which is guided towards surpassing the biggest challenges (about 150 of its employees are working on the engineering department), Martifer Metallic Constructions is especially aimed at the execution of highly complex projects.


Among the various engineering challenges faced by Martifer Metallic Constructions, we highlight:

- Caja Mágica (Madrid, Spain) which has mobile ceilings. The stadium's main ceiling is sliding. This characteristic made this project a complex and technically advanced challenge;

- Leixões Bridge is the fourth largest tilting bridge in the world, demanding extensive work in terms of preparation and in the technical monitoring of its construction;

- Champalimaud Foundation (Lisbon) where Martifer participated in various parts of the building, including the "eye" of the building (a large oval window) and GlassFin facades (made up by glass pillars which provide the structural support to the exterior glass), the most complex technical part of the building;

- Dublin Airport (Ireland) involved the design of solutions with more than 1,500 designs issued over 10 months, and the performance of various acoustic, resistance and water and air proof resistance tests, for the opaque and glass solutions.